Difference between revisions of "ProjectWise Guidance"

From DelDOT CADD Wiki

 
(9 intermediate revisions by the same user not shown)
Line 15: Line 15:
<h2>Forms</h2>
<h2>Forms</h2>
     <ul>
     <ul>
         <li>[[:Media:ProjectWise_Project_Creation_and_Access_Control_Form_v3.1.xlsx|ProjectWise Project Creation and Access Control Form (v3.1)]]</li>
         <li>[[:Media:ProjectWise_Access_Control_Form_v1.1.xlsm|ProjectWise Access Control Form (v1.2)]]  <span class="tooltip">
<span class="justthetip">!</span>
<span class="tooltiptext">It is recommended that you make a copy of this form and rename it to include the T-number for each project to track permission changes.<br><br>Note, when sending to CADD Support, use the <b>No Change</b> option in Column 1 for existing users that require no change.<br><br>Note, Consultants must CC in the DelDOT PM for the Project so they are aware of any permission changes.</span></span></li>
        <li>[[:Media:ProjectWise_Project_Creation_Form_v1.0.xlsx|ProjectWise Project Creation Form (v1.1)]]   <span class="tooltip">
<span class="justthetip">!</span>
<span class="tooltiptext">When submitting the Project Creation form for a new project, you do <b>not</b> need to include the Access Control Form as the Project Creation form includes the initial access control.<br>You only need the Access Control Form for managing access to existing projects.</span></span></li>
     </ul>
     </ul>

Latest revision as of 07:23, 17 April 2024

Guidelines

Forms

  • ProjectWise Access Control Form (v1.2) ! It is recommended that you make a copy of this form and rename it to include the T-number for each project to track permission changes.

    Note, when sending to CADD Support, use the No Change option in Column 1 for existing users that require no change.

    Note, Consultants must CC in the DelDOT PM for the Project so they are aware of any permission changes.
  • ProjectWise Project Creation Form (v1.1) ! When submitting the Project Creation form for a new project, you do not need to include the Access Control Form as the Project Creation form includes the initial access control.
    You only need the Access Control Form for managing access to existing projects.