Difference between revisions of "ProjectWise Guidance"
From DelDOT CADD Wiki
Line 17: | Line 17: | ||
<li>[[:Media:ProjectWise_Access_Control_Form_v1.1.xlsm|ProjectWise Access Control Form (v1.1)]] <span class="tooltip"> | <li>[[:Media:ProjectWise_Access_Control_Form_v1.1.xlsm|ProjectWise Access Control Form (v1.1)]] <span class="tooltip"> | ||
<span class="justthetip">!</span> | <span class="justthetip">!</span> | ||
<span class="tooltiptext">It is recommended that you make a copy of this form and rename it to include the T-number for each project to track permission changes.<br><br>Note, when sending to CADD Support, use the <b>No Change</b> option in Column 1 for existing users that require no change.</span></span></li> | <span class="tooltiptext">It is recommended that you make a copy of this form and rename it to include the T-number for each project to track permission changes.<br><br>Note, when sending to CADD Support, use the <b>No Change</b> option in Column 1 for existing users that require no change.<br><br>Note, Consultants must CC in the DelDOT PM for the Project so they are aware of any permission changes.</span></span></li> | ||
<li>[[:Media:ProjectWise_Project_Creation_Form_v1.0.xlsx|ProjectWise Project Creation Form (v1.0)]]</li> | <li>[[:Media:ProjectWise_Project_Creation_Form_v1.0.xlsx|ProjectWise Project Creation Form (v1.0)]]</li> | ||
</ul> | </ul> |
Revision as of 07:38, 1 April 2024
Guidelines
- ProjectWise Explorer Configuration - PW2101
- ProjectWise Folder Structure and Contents - PW2102
- Creating a New MSCE/ORD File in ProjectWise Explorer - PW2103
- Adding an Existing MSCE/ORD File to ProjectWise Datasource - PW2104
- Merging PDFs in ProjectWise Explorer - PW2401
- Plan Reviews and ProjectWise - PW2402
Forms
- ProjectWise Access Control Form (v1.1)
!
It is recommended that you make a copy of this form and rename it to include the T-number for each project to track permission changes.
Note, when sending to CADD Support, use the No Change option in Column 1 for existing users that require no change.
Note, Consultants must CC in the DelDOT PM for the Project so they are aware of any permission changes. - ProjectWise Project Creation Form (v1.0)